Laserfiche WebLink
Phasing Guidelines <br />Cerise-Lai.?arge Lease i,1,1 C <br />June 24, 2009 , <br /> <br /> L& <br />Permit area <br />Permit area to be approximately 65 to 70 acres. Boundaries of permit area to be <br />generally as follows: <br />North boundary to be located approximately 50 feet south of the Basin <br />Ditch. Mining should stop approximately 200 feet south of the Basin <br />Ditch. <br />• East boundary to be located approximately 25 feet west of the east <br />property line. . <br />• South boundary to be located approximately 30 feet north of south <br />property line. <br />• West boundary to be located approximately 100 feet east of Crystal <br />Springs Creek. Exception to this would be the area would be anticipated <br />for entrance in to the mine off of County Road 103. This entrance is <br />anticipated to be located in an area of about 800' from the north boundary <br />to the south along; this west boundary line. <br />Phasing of Production <br />Gravel ruining and production to generally coincide with the following phasing <br />plan.: <br />• Please One - To include initial opening, of the pit and establishment of <br />entrance. This phase is approximately 1.5 to 20 acres in size. Initial. <br />stripping will happen in the nor herly half of the phase (IA). As <br />production is need, the southern half of this phase (l B) shall be stripped <br />and readied. for production The area is generally parallel to Crystal Springs <br />Road to the east and a width of approximately 400 to 700 feet in width. <br />Permanent entrance to pit shall be located off of Crystal Springs Road into <br />this initial phase on the northerly end of this phase. A 48" high <br />agricultural fence as approved by Lessor shall generally consist of 4 lines <br />of taunt heavy duty barb wire, adequate number of wood and steel line <br />posts, wood corner and line bracing, and intermediate wood stays. This <br />J'%