Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 01a State : Colorado Permit/job# : M-1981-276 <br />Date : 0912112010 County :Moffat Abbreviation :none <br />User : DMC Site :Hertzog Pit Filename :M276-01a <br />Agency or organization name: DRMS <br />Permit or other job action :112c SDG _ <br />Task description : Highwall reduction <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200,' Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour: $46.56 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $155.72 Total fleet cost/hour : $155.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 35,000 LCY factor : NA volume : 35,000 LCY <br /> <br />Source of estimated volume :Attached <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.40 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 565.76 LCY/hr <br /> Adjusted fleet production : 565.76 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 61.86 Hours <br />Unit cost : $0.275 /LCY Total job cost : $9,634 <br />