Laserfiche WebLink
Permittee: WHITEWATER BUILDING MATERIALS CORP. PAGE 3 <br />Permit #: M-1977-129 <br />Operation Name: WHITEWATER-600 PIT <br />Anniversary Date: 0912212010 <br />and Curtail'". This is still an uphill battle since there is <br />little or no control taking place on properties surrounding <br />the mine and seed is being wind blown in from offsite areas <br />that we have no control over. Spraying will continue as <br />needed. <br />(3) Mining will continue in the stripped portions of Stage 3 - <br />PART B to supplement material being removed from the raw <br />material stockpile in Stage 6. Overburden will continue to <br />be stockpiled along the perimeter of the mined area. <br />(4) All bank sloping and grading is complete on areas mined to <br />date in Phase 2 - PART A. Additional seeding may be done as <br />needed in the backfill area west of the Plant Site. We will <br />continue to slope around the mined area in Stage 3 - PART B <br />as needed. Stage W will continue to be used and mining may <br />begin on the east arm of Stage 2 - PART A <br />(5) The current contact for this pit is: <br />Mr. Mark A. Gardner (970) 242-7538 <br />Whitewater Building Materials Corp. <br />940 South 10th Street <br />Grand Junction, CO 81502 <br />The annual report date is September 22, 2010 and the effec- <br />tive date of all information is August 27, 2010. This packet <br />contains the Annual Report Maps, and the Annual Fee check for <br />$791.00. <br />Respectfully Submitted, <br />Whitewater Building Materials Corp. <br />Mark A. Gar er <br />Vice President <br />cc Whitewater Building Materials Corp. <br />file <br />F:\500-AR10.WPD