Laserfiche WebLink
Permittee: WHITEWATER BUILDING MATERIALS CORP. PAGE 2 <br />Permit #: M-1977-129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 09122/010 <br />- PART B and placed the topsoil along the north side of the <br />excavated area. This berm serves two purposes, as a topsoil <br />pile and an MSHA safety berm. The 6.00 acre raw material <br />storage area in the northwest part of Stage 6 is still being <br />used. The main processing plant is locate on the Industrial <br />Site at 1360 Coffman Road. The stripped area in Stage 3 - <br />PART B now covers 12.40 acres (yellow) and the overburden <br />stockpiled area east of the stripped area is still in use <br />(brown). This material will be used to reclaim the slopes <br />and resoil the above water area as reclamation progresses in <br />this stage. <br />(2) See Sheet 1 of 2. Final grading and sloping was completed in <br />the west arm of Stage 2 - PART A (2.79 ac.) and in Phase F <br />(1.50 ac) (diamond hatched). Approximately 2.80 acres was <br />backfilled in the northwest part of Stage 2 - PART A. The <br />Cattle Feeding Area in Phases A thru F was graded this year <br />completing reclamation on that area (purple). Revegetation <br />is complete on the south slopes of Phases A thru C. A <br />900-foot section of perimeter road was constructed for the <br />landowners on the north side of the west arm. The two <br />landowner building sites remain unchanged from last year <br />(brown) . The above water areas in Stage 2 - PART A and <br />around the backfill area were seeded in November 2009 after <br />the water level stabilized (green). Backfilling was com- <br />pleted in two areas south of the river (dark blue). The <br />seeding around Stage 2 - PART B is growing and will complete <br />it's 2 growing seasons in November 2010. <br />See Map Sheet 2 of 2. Sloping was completed around the <br />freshwater pond/settling pond in Stage 3 - PART A as it was <br />constructed in 2008. Sloping was completed on 1.70 acres <br />along the south side of Stage 3 - PART B. The topsoil/MSHA <br />safety berm was seeded this spring to protect if from ero- <br />sion. No additional reclamation is required on areas north <br />of the river. <br />We estimate there is approximately <br />den stored in Stage 6 (not on map) <br />stored in Stage 3 - PART B (brown) . <br />constant state of flux with materi; <br />as needed. The settling ponds are <br />process water (dark blue). <br />48,000 yards of overbur- <br />and another 39,000 yards <br />These piles are in a <br />a1 being added and removed <br />still being used to clean <br />Weed control continued this year in the areas around Phase <br />2- PARTS A & B and Stage 3 - PART A. We sprayed Knapweed and <br />White Top from May thru the end of the growing season in <br />2010 with water soluble 2-4-D