Laserfiche WebLink
Table 2.06.6 -1 Rule 2.06.6 Requirements <br />Item <br />Location of Response <br />(a) - Soil Survey and Identification of <br />Section 2.04.9: <br />Prime Farmlands <br />sub- section 10.0 <br />Attachment 2.04.9 -6 <br />(b) - Topsoil Removal and Replacement <br />Section 2.04.9: <br />Methodology <br />sub- sections 16.4 & 16.5 <br />Section 2.05.4(2)(d): <br />sub- sections 11.0, 12.1, & 13.1 <br />Maps 2.05.4 -4, 2.05.4 -6, & 2.05.4 -8 <br />(c) - Topsoil Stockpile and Storage Plans" <br />Section 2.05.4(2)(d): <br />sub- section 8.0 & 12.1 <br />Maps 2.05.4 -5, 2.05.4 -6, 2.05.4 -7 <br />(d) - Suitable Subsoil Documentation <br />Section 2.05.4(2)(d): <br />sub- section 6.0, 7.0, 11.0, & 14.0 <br />Attachment 2.05.4(2)(d) -1 <br />(e) - Revegetation Plans <br />Section 2.05.4(2)(e): <br />sub- sections 5.0 & 9.0 <br />Map 2.05.4 -5 <br />(f) - Certification of Proposed Plans <br />Attachments 2.04.9 -6 & 2.05.4(2)(e) -11 <br />(g) - NRCS Determination of Prime <br />Section 2.05.4(2)(e): <br />Farmland Productivity <br />sub- section 5.5.2 <br />Attachments 2.04.9 -6 2.05.4(2)(e) -3 <br />(h) - Return of Soil Productivity <br />Section 2.05.4(2)(e): <br />sub- sections 5.6, 5.7, 5.5.3, & 5.5.4 <br />Section 2.05.4(2)(d): <br />sub- sections 13.1 & 14.0 <br />(Revised PR 06) 2.06.6 -2 <br />