My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-22_REVISION - C1981008 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-09-22_REVISION - C1981008 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:20 PM
Creation date
9/22/2010 5:01:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/22/2010
Doc Name
Response 5 Revised Section 2.05.4(2)(d)
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Zone 2 is a 12.21 acre field that will receive 21 inches of Mixed Topsoil and currently has <br />33 inches of Bench 1 Subsoil Substitute. Total combined topsoil thickness will be 54 <br />inches. <br />• Zone 3 is a 31.68 acre field that will receive 21 inch of Mixed Topsoil and 33 inches of Lift <br />B Topsoil. Total combined topsoil thickness will be 54 inches. <br />• Zone 4 is a 54.33 acre field that will receive 24 inches of Lift A Topsoil along with 33 <br />inches of Lift B Topsoil. Total combined topsoil thickness will be 58 inches. <br />• Zone 5 is a 1.90 acre piece that was left undisturbed because it was needed as a blasting <br />buffer zone around Frank Morgan's home. This zone was only included to account for the <br />total acreage of land within Morgan permitted land as 107.96 acres. <br />The topsoil and subsoil balance for the Morgan property prime farmland can be seen on Map <br />2.04.5 -6 and Table 2.05.4(2)(d) -3. Currently (June 2010) some material is stockpiled on the eastern <br />side of the Morgan property, some material is already placed in its appropriate location, and some <br />material is yet to be excavated. Map 2.04.5 -6 and Table 2.05.4(2)(d) -3 are designed to show that <br />the above discussed topsoil replacement plan for each zone can be accomplished with the Mixed <br />Topsoil, Lift A Topsoil, Lift B Topsoil, and Bench Substitute Subsoil available on the Morgan <br />Property. <br />(Revised PR 06) 2.05.4(2)(d) -29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.