Laserfiche WebLink
amec* <br />D) Geomembrane Delivery <br />1) VLF <br />No geomembrane was delivered to site during the week. <br />E) Geomembrane Exposure <br />1) VLF <br />Exposure of the Phase IV geomembrane between stations G22+00 (+/-) and G29+00 (+/-), <br />approximately 200 feet left of centerline was performed using a John Deere 35D excavator and <br />three laborers. An AMEC field representative observed the geomembrane exposure constantly. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed structural fill placement within the Phase 5 VLF fill area. <br />AMEC inspected and approved subgrade prior to SLF placement. <br />AMEC observed, performed testing, obtained samples, and assisted in the placement of Soil Liner Fill <br />material within the Phase VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed and inspected anchor trench construction. <br />AMEC observed the installation of the low volume solution collection system. <br />AMEC observed and obtained samples LVSCF placement. <br />AMEC inspected and approved secondary geomembrane for further construction activities. <br />AMEC observed the remediation of the temporary drain pipe at the toe of the South Toe Berm. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 09.04.10.1)