2010-09-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-09-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
9/22/2010 11:42:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/20/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 08/29/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'O <br />The temporary drain located near the south toe berm was removed to allow for LVSCF placement <br />in the area. The HDPE pipe was cut approximately 6-inches below the bottom of SLF. The pipe <br />was then plugged with concrete approximately 4-feet in length and the end capped with concrete. <br />SLF material was then placed over the concrete plugged pipe repairing the subgrade to allow for <br />the geomembrane in the area to be repaired. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />DCF Process 0 121,223 <br />Total 0 121,223 <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued performing deployment, <br />seaming, and repair/QC activities. Geomembrane installation was performed in the area shown <br />in Figure 3. Approximately 157,439 square feet of secondary 100mil LLDPE was deployed <br />using a John Deere 200 excavator and a John Deere 544 front-end loader with spreader-bar <br />attachments. Subgrade was inspected and approved by AMEC and Lone Star representatives <br />prior to geomembrane deployment (see Figure 3). Approximately 9,257 linear feet of seam was <br />fusion welded using four fusion welding machines. Nineteen destructive test samples were <br />marked during fusion seaming. All destructive tests performed were within project <br />specifications. Non-destructive testing was performed for fusion welded seams. Repairs were <br />performed using the extrusion welding method for all marked defects. Vacuum testing was <br />performed for all extrusion welded seams and repairs. <br />B) Anchor Trench <br />1) VLF <br />PSSA anchor trench excavation continued between stations K4+00 (+/-) and E5+00 (+/-) using <br />a CAT 312 excavator and one laborer. The anchor trench was inspected by an AMEC field <br />representative and found to be constructed in accordance with design drawings and project <br />specifications. <br />C) Geomembrane Acceptance <br />1) VLF <br />Secondary 100mil geomembrane (S-613 thru S-614, S-622 thru S-631, S-700 thru S-717, S- <br />749 thru S-815) shown on Figure 4a and 4b was inspected by AMEC and Lonestar <br />representatives and found to be installed within project specifications and acceptable for <br />continued construction activities. <br />VLF Weekly Report WE 09.04.10.D