Laserfiche WebLink
September 1. 5, 2010 C-I 981-022/Elk Creek Mine MP13 <br />Followin the on-site inspection, we met with Ken all Project Man for OMLLC to discuss an <br />drilled borehole methodolo OMLLC also has MR-92 pending approval for two an drilled boreholes. The <br />purpose of the two boreholes is to enhance methane draina b attemptin to intercept a linear g eolo g ic joint <br />feature expected to occur between GVB LW -1 -0 C and GVB -LW -1 -02 boreholes. <br />SUPPORT FACILITIES - Rule 4.04: <br />Construction activities have been completed at the methane draina facilit located at the Elk Creek Fan bench. <br />The g ob vent borehole, twin electric driven methane exhauster s and buildin are a.11 completed and the <br />s was in operation at the time of the inspection. See attached Photo No. I and I <br />No problems were noted at an of the facilit locations durin this inspection. <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Pa 3 of 5 <br />