My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-16_REVISION - M1983037
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983037
>
2010-09-16_REVISION - M1983037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:22 AM
Creation date
9/20/2010 3:24:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983037
IBM Index Class Name
REVISION
Doc Date
9/16/2010
Doc Name
Reclamation Costs Update and Notice of Surety Increase SI-01
From
DRMS
To
Louis Wyman
Type & Sequence
SI1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 01a State :Colorado Permit/job# :M-1983-037 <br />Date : 0911612010 County :Routt Abbreviation :none <br />User : DMC Site: Wyman Pit Filename :M037-01a <br />Agency or organization name : DRMS <br />Permit or other job action 110c SDG <br />Task description :Highwall reduction <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> <br />Utilization % _ <br />Cost Breakdown : Ownership cost/hour : $46.56 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $155.72 Total fleet cost/ho ur : $155.72 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,167 L CY factor : NA volume : 4,167 LCY <br /> <br />Source of estimated volume :Attached <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 _ <br />(1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient:- 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.90 (Cat HB)_ <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.40 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 565.76 LCY/hr <br /> Adjusted fleet production : 565.76 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 7.37 Hours <br />Unit cost : $0.275 /LCY Total job cost : $1,147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.