My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-16_REVISION - M1983037
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983037
>
2010-09-16_REVISION - M1983037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:22 AM
Creation date
9/20/2010 3:24:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983037
IBM Index Class Name
REVISION
Doc Date
9/16/2010
Doc Name
Reclamation Costs Update and Notice of Surety Increase SI-01
From
DRMS
To
Louis Wyman
Type & Sequence
SI1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 16-Sep-2010 Permit or job no. M-1983-037 Site : Wyman Pit <br />User : DMC Abbreviation : none State :Colorado <br />Filename : M037-000 County : Routt <br />Agency or organization name: DRMS <br />Permit or job action :110c SDG <br /> <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION <br />FORM <br />USED <br />FLEET <br />SIZE <br />TASK <br />HOURS .......... <br />DIRECT <br />COST <br />01a -Highwall reduction dozer 1 7.3 $1, <br />147 <br />02a -Topsoil application dozer 1 7.5 _ <br />_ <br />$1,255 <br />03a -Revegetation of currently disturbed area revege 1 40.0 $3,431 <br />04a -Mobilize reclamation equipment/labor mobilize 1 5.4 $1,473 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 60.3 $7,306 <br />includes intlation factor adjustment of : NA % TOTAL DIRECT COST $7,306 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance 2 02 % of direct total = $148 <br />Performance bond : 1.05 % of direct total = $77 <br />Job superintendent : NA` NA NA total = NA <br />Profit : 10.00 % of direct total = $731 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $955 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $8,261 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $413 <br />CONTINGENCY- NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST= $1,868 <br />TOTAL BOND AMOUNT (direct + indirect) _ $9,174
The URL can be used to link to this page
Your browser does not support the video tag.