Laserfiche WebLink
8.0 PROCEDURES FOR UPDATING THE SPCC/MCP <br /> Climax Mine will conduct an annual review of the SPCC/MCP to identify areas where major <br /> changes have taken place which affect spill control or materials containment procedures. An <br /> updated SPCC/MCP will be submitted to the regulatory authority no later than 60 days after the <br /> effective date of the CPDES permit for Climax Mine (CO-0000248). <br /> 71 <br />