Laserfiche WebLink
5.3.2.3 (cont.) <br /> Reporting: In the event of a failure in the pipeline system and if the discharge passes through <br /> the blocked portion of the North Interceptor Canal, a "Spill Incident Report" form will be <br /> completed immediately and given to the Environmental Coordinator. If the waters of the State of <br /> Colorado are threatened by a spill of industrial water, the procedures outlined in Sections 4.2, <br /> 4.3, and 4.4 of this SPCC Plan should be followed. As a matter of corporate policy, a high level <br /> of careful documentation is required for any system failure at No. 4 Dam (Eagle Park Reservoir). <br /> 50 <br />