Laserfiche WebLink
5.3.2.2 (cont.) <br /> Reporting: In the event of a failure in one of the pipelines and subsequent discharge to the <br /> Chalk Mountain Interceptor Canal "cut-out," a"Spill Incident Report" form (Appendix 1) should <br /> be completed immediately and given to the Environmental Coordinator. If the waters of the <br /> State of Colorado are threatened by a spill of industrial water, the procedures in Sections 4.2, 4.3, <br /> and 4.4 of this SPCC should be followed. As a matter of corporate policy, a high level of <br /> careful documentation is required for any system failure associated with the Robinson Mill <br /> Water Return Pipeline. <br /> 48 <br />