Laserfiche WebLink
FLAG RESOURCES, INC. PAGE 2 <br />SILT PIT - TECHNICAL REVISION-05 <br />SEPTEMBER 7, 20113 <br />asphalt at he mine to take advantage of these requirement and <br />needs. Per your suggestion, in your inspection report, we have <br />determined that we have need to store up to 2,500 yards of <br />unprocessed broken asphalt and 1,000 yards of unprocessed broken <br />concrete on the site to keep our finished recycled product <br />inventory sufficient to meet peak demands. These are the maximum <br />amounts of raw material we would stockpile at any one time. It <br />is our intention to begin processing the asphalt and concrete <br />well before we reach this level. <br />Attached is a check for the $216.00 Technical Revision fee <br />and if you have any questions please call me at the above number <br />or Steve O'Brian of Environment, Inc., at (303) 423-7297. <br />Sincerely, <br />Flag Resources, Inc. <br />4,1,X 4, <br />Fred Frei, <br />President <br />cc Environment, Inc. <br />File <br />enclosures <br />, .. <br />_'?A.