My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-09_REVISION - M1981202SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981202
>
2010-09-09_REVISION - M1981202SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:56 PM
Creation date
9/14/2010 11:13:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981202SG
IBM Index Class Name
REVISION
Doc Date
9/9/2010
Doc Name
Technical Revision - 05
From
Flag Resources, Inc.
To
DRMS
Type & Sequence
TR5
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dustin Czapla <br />101 South Third, Suite 301 <br />Grand Junction, CO 81501 <br />dba flag Sand.& Gravel <br />1412 County)2oad 311 <br />)Vem Castle. CO 81647 <br />970-876-2397 <br />,Fax 970.876-5232 <br />,Fred and Janet fret <br />?MC_ <br />M- 1981-z09' 54 <br />RECEIVED <br />SEP u 9 2010 <br />GRAND JU ;,, ... ?", OFFICE <br />DIVIt' IGN OF <br />RECLAMATION MINING & SAFETY <br /> <br />Dear Mr. Czapla: <br />RE S Pit,, Permit # M 1981-202SG <br />&T 13 2010- <br />D6ai:,ron of r• eciar+,ation, <br />P,fit*;g 2nd S&*j <br />This Technical Revision was prepared in response to your <br />inspection report dated 5/04/10. In the inspection report the <br />Divisions requested we file Technical Revision to add a Weed <br />Control Plan and to allow for recycling asphalt at the mine. <br />However, a weed control plan is not needed since the existing <br />Weed Control Plan was approved by the Division on 11/27/06. We <br />have updated it, to add the additional weeds noted in the inspec- <br />tion report and make it more flexible to do control on all <br />noxious weeds. The revised Weed Control Plan is attached for <br />your review. The following text addresses the request to allow <br />asphalt and concrete recycling at the mine. <br />Recycling <br />In the current market the need for recycled materials to <br />offset the use of raw material as base material is becoming a <br />reality. More and more state and local contracts call for using <br />certain percentages of recycled aggregates for building infra- <br />structure like road and parking lots. We have found it is <br />practical of have the ability to process aged concrete and
The URL can be used to link to this page
Your browser does not support the video tag.