Laserfiche WebLink
August 31, 2010 C- 1981 -035 /King Coal Mine MLT <br />REVEGETATION — Rule 4.15 <br />Vegetative Cover; Timing: <br />• Revegetation on the outer face of the refuse pile was coming along well. Mr. Jarvis explained that <br />weed control efforts conducted during a previous year had gone awry, necessitating that the entire <br />slope be reseeded. <br />SUPPORT FACILITIES - Rule 4.04: <br />• Demolition work at the King I site has progressed since the July 2010 inspection (Photo 5), although <br />the screening frame has not yet been dismantled (Photo 6); Mr. Jarvis explained that a crane had been <br />brought to the site, but was removed due to the rainy and muddy conditions. <br />SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS — Rule 4.07 <br />RECLAMATION PLAN COMPLIANCE — Rule 4.13 <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 2 Page 3 of 7 <br />Number of Complete Inspections this Fiscal Year: 0 <br />