Laserfiche WebLink
replacement on Pit B regraded areas, spoil pile footprint, and regraded access roads and seeding of <br />all topsoiled areas; grading and seeding of topsoil stockpile footprints; and structural demolition of <br />facilities area. Details of the Keenesburg Mine's reclamation plan may be found in Section 2.05.4 <br />(p. 113) of the permit. Pond 2, the Dugout Pond, and the East and West perimeter diversion ditches <br />are approved to remain permanently. <br />Any person with a valid legal interest which might be adversely affected by this proposed decision <br />may request a formal public hearing before the Mined Land Reclamation Board in accordance with <br />Rule 3.03.2(6). Public notice of this proposed decision will be published once per week for two <br />weeks in the Fort Lupton Press as soon as possible. Requests for public hearing must be submitted <br />to the Division in writing within thirty days of the first publication in the Fort Lupton Press. If no <br />hearing is requested within thirty days, the Division's proposed decision will become final. <br />C1981 -028, SL -05 8 9/10/2010 <br />