My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-10_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2010-09-10_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:57 PM
Creation date
9/14/2010 8:49:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/10/2010
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Phase II for 51.05
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. PROPOSED DECISION <br />Based on the observations above, the Division proposes to approve Coors Energy Company's <br />request for a Phase II bond release for the Keenesburg Strip Mine. This proposed decision will <br />release the applicant from a portion of the liability in accordance with Rule 3.03.1(2)(b). The :Phase <br />II bond release applies to 51.05 acres consisting of parcels 2, 5, 6, 7, 9, 10, 15, 16, 19, 23, and 29. <br />The Division in SL -03 redefined the original bond amount of $4,402,022.00 to be the "applicable <br />bond amount' ' for determining bond release, with no subtraction of structural demolition costs prior <br />to calculating Phase WFIII liability release values. <br />In SL -05, Coors Energy Company has requested a bond release of $179,646.00. However, the <br />Division has estimated the cost to complete remaining reclamation tasks and maintenance following <br />the proposed approval of SL -05 to be $2,001,475.00 (see Appendix A). Rule 3.03.1(3)(d) requires <br />that adequate bond be retained to allow the Division to conduct any remaining reclamation tasks in <br />the event that the Division takes over the permit. Based on the Division's estimate of remaining <br />liability and the Division's observations of reclamation success, the Division proposes to release <br />$120,385.00 (costs associated with Phase II revegetation and topsoil replacement tasks) of Phase II <br />reclamation liability. The remaining bond of $2,001,475.00 shall be sufficient to assure completion <br />of the remaining reclamation work at the site if the work had to be performed by the Division, <br />including the cost of reestablishing vegetation on any revegetated areas should those areas fail. <br />The following table summarizes the history of liability at the Keenesburg Mine. <br />Reclamation work which remains to be done at the site includes completion of backfill and grading <br />of the remaining portions of Pit B; ripping and regrading of interior access roads; topsoil <br />C1981 -028, SL -05 7 9/10/2010 <br />Phase release <br />Acres released <br />Reclamation <br />liability <br />Original applicable <br />liability amount <br />$4,402,022.00 <br />SLl <br />I and II <br />179 (PI) & 111(PII) <br />- $1,787,113.00 <br />TR32 <br />(bond reduction) <br />I & I1 tasks <br />4.5 <br />- $27,384.00 <br />MT4 <br />+$140,963.00 <br />SL2 <br />I <br />51.76 <br />- $287,918.00 <br />SU <br />II <br />53.9 <br />- $130,189.80 <br />RN5 <br />+17,056.80 <br />SRI <br />- $37,666.00 <br />SL4 <br />III <br />165.29 <br />- $167,911.00 <br />SL5 <br />II <br />51.05 <br />- $120,385.00 <br />Remaining liability <br />amount <br />$2,001,475.00 <br />Reclamation work which remains to be done at the site includes completion of backfill and grading <br />of the remaining portions of Pit B; ripping and regrading of interior access roads; topsoil <br />C1981 -028, SL -05 7 9/10/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.