My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-10_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2010-09-10_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:57 PM
Creation date
9/14/2010 8:49:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/10/2010
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Phase II for 51.05
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS <br />Ownership Costs <br />Depreciation CFC Overhead <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost: <br />$17.13 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Econ.life - Machine and Attach. No. 1 : <br />$17.13 <br />NA <br />NA <br />$8.99 <br />$21.14 <br />$10.52 <br />$20.59 <br />NA <br />NA <br />NA <br />NA <br />- Attachment No. 2: <br />$5.72 <br />1 $0.00 $0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Annual usage: <br />$25.85 <br />$15.15 <br />$17.17 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Double shifts: <br />$19.38 <br />$7.57 <br />$8.58 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Triple shifts : <br />$17.24 <br />$5.04 <br />$5.72 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Mech. Ibr.- Machine and Attach. No. 1: <br />NA <br />NA <br />NA <br />$8.15 <br />NA <br />$9.54 <br />NA <br />NA <br />NA <br />NA <br />NA <br />- Attachment No. 2:1 <br />NA <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Fuel /lube - Machine and Attach. No. 1: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$31.57 <br />$7.62 <br />$0.00 <br />$2.98 <br />Attachment No. 2 :1 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />ADJUSTED COST SUBTOTALS <br />Depreciation <br />Ownership Costs <br />CFC <br />Overhead <br />Overhaul <br />Labor Parts <br />Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2: <br />Shift Differential <br />Colorado Labor zone : 1 <br />Basic Machine and Attachment No. 1 <br />6.20% <br />Single shifts: <br />$25.85 <br />$15.15 <br />$17.17 <br />$8.15 $21.14 <br />$9.54 <br />$20.59 $31.57 $7.62 $0.00 $2.98 <br />Double shifts: <br />$19.38 <br />$7.57 <br />$8.58 <br />Attachment: <br />Dozer operator (> 70hp) <br />$23.67 <br />Triple shifts: <br />$17.24 <br />$5.04 <br />$5.72 <br />1 $0.00 $0.00 <br />$0.00 <br />$0.00 $0.00 $0.00 <br />$0.00 $0.00 <br />HOURLY OPERATOR WAGES <br />Base <br />Rate <br />Fringe <br />Benefits <br />F.I.C.A. <br />Unempl. <br />Wk.Comp. <br />Total <br />($ /hr) <br />Shift Differential <br />Colorado Labor zone : 1 <br />7.65% <br />6.20% <br />10.00% <br />Dozer operator (< 70hp) <br />$23.67 <br />$9.22 <br />$1.81 <br />$1.47 <br />$2.37 <br />$38.54 <br />Day <br />$0.00 <br />Two shift per day average: <br />$0.15 <br />Dozer operator (> 70hp) <br />$23.67 <br />$9.22 <br />$1.81 <br />$1.47 <br />$2.37 <br />$38.54 <br />win <br />$0.30 <br />Three shift per day average : <br />$0.25 <br />Mechanic <br />$23.82 <br />$9.22 <br />$1.82 <br />$1.48 <br />$2.38 <br />$38.72 <br />i <br />E!Nghjt <br />$0.45 <br />NA <br />HOURLY EQUIPMENT COST SUMMARY <br />Single shifts: <br />Double shifts : <br />Triple shifts : <br />Ownership <br />Operating and Overhaul <br />Machine Attachments <br />Operator <br />Total <br />Cost/hr ($) <br />$58.16 <br />$101.59 <br />$0.00 <br />$38.54 <br />$198.29 <br />$35.54 <br />$101.59 <br />$0.00 <br />$38.69 <br />$175.82 <br />$28.00 <br />$101.59 <br />$0.00 <br />$38.79 <br />$168.38 <br />EQUIPMENT PERFORMANCE DATA <br />Description Type <br />Struck <br />Capacity (cy) <br />Heaped <br />Capacity (cy) <br />Weight <br />(UST) <br />Weight <br />(MT) <br />Length <br />(ft) <br />Width <br />(ft) <br />Height <br />(ft) <br />Min. turning <br />circle (ft) <br />Horsepower <br />(fhp) <br />Fuel <br />type <br />Cat D9R - 9SU (2005) <br />Semi- Universal <br />NA <br />NA <br />53.40 <br />NA <br />22.42 <br />9.67 <br />13.08 <br />NA <br />405.00 <br />Diesel <br />Dozer blade <br />NA <br />NA <br />17.70 <br />7.21 <br />NA <br />NA <br />14.17 <br />6.34 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Travel speeds (mph): 1 st (or max. ) 2nd 3rd 4th 5th 6th I 7th I 8th j Minimum dump Max. dump <br />Forward : <br />2.4 <br />4.2 <br />7.3 <br />NA <br />NA <br />NA <br />NA <br />NA <br />clearance (ft.) <br />height (ft) <br />Reverse : <br />3.0 <br />5.2 <br />9.1 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (lbs) Max.dig /rip Shank No. <br />Compactor drum type width /pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft_) spacing shanks <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.