Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />45A State : Colorado Permit/job #: C- 1981 -028 <br />09/03/2010 County :Weld Abbreviation :none <br />JHB Site: Keenesburg Strip Mine Filename : CO28 -45A <br />Permit or other job action : S15 <br />Task description :haul topsoil to unreclaimed Interior access roads <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Cost Brc <br />ipment Description <br />Scraper work team - Scraper :Cat 637G w /push -pull <br />-Push dozer:NA <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area : NA <br />Road maintenance -Motor grader :ICA T 14H <br />-Water truck :I Water Tanker, 3,500 Gal. <br />akdown : <br />Scraper Work Team <br />Scraper Dozer <br />Support Equipment <br />Load area Dump area <br />Road Maintenance Equipment <br />Grader Water truck <br />Import data filename: <br />scraper2 <br />NA <br />dozer <br />NA <br />grader <br />misctruk <br />% Utilization-machine: <br />- Ripper attachment: <br />100 <br />NA <br />25 <br />NA <br />2525 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownerhip cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />$109.89 <br />NA <br />$58.16 <br />NA <br />$41.68 <br />$11.98 <br />$173.96 <br />NA <br />$25.40 <br />NA <br />$12.15 <br />$6.08 <br />NA <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />$38.72 <br />NA <br />$38.54 <br />NA <br />$38.91 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$322.57 <br />NA <br />$122.09 <br />NA <br />$92.74 <br />$56.76 <br />2 <br />0 <br />1 <br />0 <br />1 <br />1 <br />Group subtotals :1 <br />Work: $645.14 <br />Support: $122.09 <br />Maintenance : $149.50 <br />Total work team cost/hour : $916.73 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 38,815 CCY factor : 1.060 volume: 41,144 LCY <br />Source of quantity take -off :2008 ARR <br />Source of estimated swell factor: Caterpillar Handbook <br />