Laserfiche WebLink
Attachment no. 2:3-shank ripper <br />Data source : <br />(CRG) <br />Utilization % <br />Cost Breakdown: <br />Ownership cost/hour : <br />$66.25 NA <br />Dozer operating cost/hour : <br />$101.59 100 <br />Ripper <br />operating cost/hour : <br />$8.11 100 <br />Operator cost/hour : <br />$38.54 NA <br />Total unit cost/hour : <br />$214.49 Total fleet cost/hour : <br />$214.49 <br />MATERIAL QUANTITIES <br />Selected estimating method : <br />Area <br />Alternate methods - <br />Seismic : NA NA Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area : 12.20 acres <br />Rip depth (ft) : <br />1.50 Volume: <br />29,524 <br />BCY or CCY <br />Source of estimated quantity: Permit boundary Map <br />Source of estimated load factor: NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Correction Factors - <br />Seismic : Seismic velocity: <br />NA feet/second <br />Unadjusted production <br />Unadjusted production : <br />NA cu. yds. /hour <br />per selected method : <br />2,155.04 <br />cu. yds. /hour <br />Area : Avg. ripping depth : <br />1.50 feet/pass <br />Site altitude : <br />5,000 <br />feet <br />Average ripping width : <br />7.67 feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />500.00 feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed : <br />88.00 feet/minute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: <br />0.25 minutes /pass <br />Production per unit area : <br />0.891 acres /hour <br />Adjusted unit production : <br />1,788.69 <br />cu. yds. /hour <br />Unadjusted production : <br />2,155.04 cu. yds. /hour <br />Adjusted fleet production : <br />1,788.69 <br />cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : <br />1 dozer(s) <br />Total job time : <br />16.51 <br />hours <br />Unit cost: <br />$0.120 per cu. yd. <br />Total job cost: <br />$3,540 <br />