My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-10_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2010-09-10_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:57 PM
Creation date
9/14/2010 8:49:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/10/2010
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Phase II for 51.05
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # : <br />Date : <br />User: <br />Agency or organization name: Division Of Reclamation, Mining And Safety <br />033 State : Colorado Permit/job #: C -81 -028 <br />0910312010 County: Weld Abbreviation :none <br />JHB Site :Keenesburg Filename :CO28 -033 <br />Permit or other job action : S15 <br />Task description :Haul 4630 CY topsoil to facilities area <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Shift basis: 1 per day <br />Description <br />Scraper work team -Scraper: Cat 637G w /push -pull <br />-Push dozer:NA <br />Support equipment -Load area :Cat D9R - 9SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />sheet 1 of 2 <br />akdown : <br />Scraper Work Team <br />Scraper Dozer <br />Support Equipment <br />Load area Dump area <br />Road Maintenance Equipment <br />Grader Water truck <br />Import data filename: <br />scraper2 <br />NA <br />dozer <br />NA <br />NA <br />NA <br />% Utilization-machine: <br />- Ripper attachment: <br />100 <br />NA <br />25 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownerhip cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />$109.89 <br />NA <br />$58.16 <br />NA <br />NA <br />NA <br />$173.96 <br />NA <br />$25.40 <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />$38.72 <br />NA <br />$38.54 <br />NA <br />NA <br />NA <br />Unit subtotals : <br />Number of units :1 <br />$322.57 <br />NA <br />$122.09 <br />NA <br />NA <br />NA <br />2 <br />0 <br />1 <br />0 <br />0 <br />0 <br />Group subtotals :1 <br />Work: $645.14 <br />Support: $122.09 <br />Maintenance : $0.00 <br />Total work team cost/hour : $767.23 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,630 CCY factor : 1.060 volume: 4,908 LCY <br />Source of quantity take -off :Permit Committment, 6 Inches topsoil <br />Source of estimated swell factor: Caterpillar Performance Handbook 23rd. ed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.