My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-10_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2010-09-10_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:21:57 PM
Creation date
9/14/2010 8:49:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
9/10/2010
Doc Name
Proposed Decision & Findings of Compliance for SL5
From
Phase II for 51.05
Permit Index Doc Type
Findings
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Division Of Reclamation, Mining And Safety <br />Permit or other job action : SL5 <br />Task description: place topsoil on powder magazine area <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type: Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : NA <br />Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. costihour : <br />Operator cost/hour : <br />Total unit cost/hour: <br />MATERIAL QUANTITIES <br />Initial Swell <br />Utilization % <br />$58.16 NA <br />$101.59 100 <br />$0.00 NA <br />$38.54 NA <br />$198.29 Total fleet cost/hour : $198.29 <br />Loose <br />volume: 370 CCY factor : 1.060 volume <br />392 LCY <br />Source of estimated volume :2003 ARR map <br />Source of estimated swell factor <br />: program <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : <br />63 <br />feet <br />Material consistency: <br />1.00 <br />(Cat HB) <br />Unadjusted hourly production : <br />1,872.0 <br />LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency: <br />0.83 <br />(1shift/day) <br />Consolidated stockpile <br />Spoil pile: <br />0.70 <br />(fnd -mg <br />Push gradient: <br />1.02 <br />(Cat HB)_ <br />Average push gradient: <br />1.00 <br />% (neg) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude : <br />5,000 <br />feet <br />Material weight: <br />0.81 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U)_ <br />Material weight: <br />2,850 <br />Ibs /LCY <br />Net correction : <br />0.36 <br />Weight description <br />Sand - Damp <br />Adjusted unit production : <br />673.03 <br />LCY /hr <br />Adjusted fleet production : <br />673.03 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 <br />Dozer(s) <br />Total job time : <br />0.58 <br />Hours <br />Unit cost : <br />$0.295 <br />/LCY <br />Total job cost: <br />$116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.