Laserfiche WebLink
o • • <br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.11 <br />Date of Identification: 7/10/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: M1 (N950, E5080) (Plate No. 111) <br />Description: Access road to Storks yard from Highway 91, soils for construction <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br />Preventive <br />Maintenance <br /> <br />Inspections <br /> <br />Spill Prevention <br />or Containment <br /> <br />Sediment and <br />Erosion Control <br /> <br />Management of <br />Runoff <br /> <br />Other Specific <br />Activities Remove and replace with clean material and <br />re <br />d <br /> see <br />. <br />• <br />• <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure).