Laserfiche WebLink
<br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.1) <br />Date of Identification: 7/10/95 By: W. W. Wheeler and Associates, Inc. <br />Key Number: L4 (N1400, E5510) (Plate No. 111) <br />Description: Storke WWTP collection flume, evidence of overtopping, leakage through turnout gate, cracked concrete <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br /> <br />Preventive Maintain structures. Seal turnout leak. <br />Maintenance <br />Inspections During high runoff season when flows are <br /> maximum. <br />Spill Prevention Regrade area to ensure collection and delivery <br />or Containment to WWTP. <br />Sediment and Consider sediment basin. <br />Erosion Control <br />Management of <br />Runoff <br />Other Specific Consider eliminating turnouts. <br />Activities <br /> <br />• <br />Inspection Remarks: (inspection items marked N should include description of shortfall/failure).