Laserfiche WebLink
<br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.11 <br />Date of Identification: 7/6/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: K3 (1291 ON, -2170E) (Plate No. II) <br />Description: West grav <br />- <br /> <br />BMP <br />Good Housekeeping ity line/subdrain ditch above Chalk Mountain Reservoir <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />Actions Required Completion Responsible Date T By Y/N <br />Clean debris from culvert inlets. <br />Preventive <br />Maintenance <br /> <br />Inspections Daily inspection during runoff season. <br /> <br />Spill Prevention <br />or Containment <br /> <br />Sediment and <br />i <br />C <br />E <br />l <br />ros <br />on <br />ontro <br />Management of <br />Runoff <br /> <br />Other Specific <br />ti <br />iti <br />A Evaluate hydrology and re-size culverts for <br />L <br />c <br />v <br />es peak flow. I E <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure). <br />9 <br /> <br />I&I.CLI