Laserfiche WebLink
0 0 0 <br />CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br />IMPLEMENTATION AND INSPECTION <br />(SECTION 2.4.1 AND 2.5.1) <br />Date of Identification: 7/6/96 By: W. W. Wheeler and Associates, Inc. <br />Key Number: K2 (12960N, -2320E) (Plate No. 11) <br />Description: West gravity line/subdrain ditch above Chalk Mountain Reservoir <br />Semiannual Inspection Satis- <br />Scheduled Person factory? <br />BMP Actions Required Completion Responsible Date By Y/N <br />Good Housekeeping <br /> <br />Preventive <br />Maintenance <br />Inspections <br /> <br />Spill Prevention Repair ditch bank to normal freeboard. <br />or Containment <br />Sediment and <br />Erosion Control <br />Management of <br />Runoff <br />Other Specific Redirect stormwater across road toward Chalk <br />Activities Reservoir instead of into ditch. Regrade access <br />road drainage. <br />Inspection Remarks: (Inspection items marked N should include description of shortfall/failure). <br />Is <br />CJ <br />I&I.CLI