Laserfiche WebLink
CYPRUS CLIMAX MINE STORM WATER MANAGEMENT PLAN <br /> BMP IDENTIFICATION <br /> (SECTION 2.3.1) <br /> Date of Identification: 7/6/96 By: W. W. Wheeler and Associates, Inc. <br /> Evaluation Deadline Date: <br /> Key Number. C (14660N, -7330E and 14070N, -7240E) (Plate No. I) <br /> Description: Robinson Pumps pipeline crossings of Chalk Interceptor • <br /> Type of Character of Potential Pollutant: Process water return system crossing non-process/stormwater area. <br /> BMP Detailed Control, Practice or Activity <br /> Good Housekeeping <br /> Preventive <br /> Maintenance <br /> Inspections Inspect for signs of leakage at crossing of Chalk Mountain Interceptor and along pipeline routes. <br /> Spill Prevention <br /> or Containment <br /> Sediment and <br /> Erosion Control <br /> Management <br /> of Runoff <br /> Other Specific Monit and compare pump operation and discharge records to detect pipeline leaks (possibly using Honeywell Energy Monitoring <br /> Activities Syste4 Consider concrete encasement at pipe crossings of Chalk Mountain Interceptor. ,c <br />