Laserfiche WebLink
(green). Seeding will take place once we have 5 acres or <br />more that needs seeding. Floor grading will continue on <br />areas not needed by the mine operator for plant site and <br />material stockpiles. We are using the concrete bunkers for <br />material storage. <br />(3) Mining will continue on the east and south sides of the <br />Plant Site towards the permit line until that area is day <br />lighted out. Groundwater monitoring will continue as re- <br />quired in the permit. <br />(4) We will continue to mine the original permit area until it <br />is complete and we continue to collect ground water level <br />samples as required in the 2007 Technical Revision. <br />(5) Current contact: <br />Mr. Ken Evans <br />P.O. Box 204 <br />-- - - - -? - -- Graff -CO-80446`"- - - -- - - - - <br />(970) 887-8995 <br />The effective date of all information in this report is <br />August 2, 2010. The annual fee payment for $791.00 was submitted <br />under separate cover. <br />Respectfully Submitted, <br />Reclamation Ridge, LLC. <br />Ken Eva s <br />cc file <br />Environment, Inc. <br />enclosure