Laserfiche WebLink
NA % <br />Agency or organization name : DRMS <br />Permit or job action :Amendment AM-1 <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Remove or relocate equipment, parts, debris demolish 1 8.0 $1,454 <br />002 -Pull up edge of benches and move sed ponds excavate 1 34.5 $3,022 <br />003 -Haul out waste rock for backfill and shaping loader 1 117.4 $6,566 <br />004 -Grade waste rock to 3:1 dozer 1 21.6 $2,798 <br />005 -Haul reclamation equipment to and from site mobilize 1 4.4 $1,522 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 186.0 $15,362 <br />* includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />TOTAL DIRECT COST * =I $15,362 <br />Liability insurance : 2.02 % of direct total = $310 <br />Performance bond : 1.05 % of direct total = $161 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $1,536 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $2,008 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $17,370 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $868 <br />CONTINGENCY- NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $3,376 <br />TOTAL BOND AMOUNT (direct + indirect) _ $18,738