Laserfiche WebLink
C -1981 -008 <br />PR -06 AR #5 <br />August 25, 2010 <br />Page 10 of 26 <br />Rule 2.05.3 (4) — Ponds impoundments, other treatment facilities and diversions <br />22. -25. Previously resolved. <br />26. This item requested that corrections be made to the labeling of certain Attachments to Section <br />2.05.3(3). Item Resolved <br />27 -29. Previously resolved. <br />Rule 2A5.4(2)(c) Backfilling and Grading Plan <br />30 -35. Previously resolved. <br />36. a. Previously resolved. <br />b. This item requested that the locations of any temporary overburden stockpiles be delineated <br />on Map 2.05.4 -1 -2. This item was not addressed in the adequacy response, but WFC <br />subsequently stated verbally that no temporary stockpiling of overburden would occur. Item <br />Resolved. <br />c. Previously resolved. <br />37. Map 2.05.4 -1 <br />a. The Division requested that the horizontal scale of the cross sections be adjusted from 1" = <br />350' to 1" = 400'. WFC provided the Division with an electronic version of Map 2.05.4 -1 on <br />August 19th, verifying that the horizontal scale of the cross sections has been changed as <br />requested. Hard copies of the map, sealed as required by the Rules, will be provided with the <br />final approved submittal. Item Resolved <br />b -c. Previously resolved. <br />38. Previously resolved. <br />Rule 2.05.3 (5) To soil Removal and Stora e• Rule 2.05.4(2)(d) Reclamation Plan for Removal <br />Storage and Redistribution of Topsoil and Subsoil <br />39A. a. This item requested additional changes to new Map 2.05.4 -6. <br />i. This item requested that the note beneath Table A be revised to include a description of <br />where, and in which Zone, any excess topsoil will be distributed. Item Resolved <br />ii. This item requested clarification of topsoil salvage loss and replacement volumes <br />represented in Tables B and C. WFC has explained that the 93% topsoil salvage rate was <br />applied only to the Lift A and Lift B Topsoil that had yet to be stripped. The Division <br />suggests that topsoil volume calculations as presented in Table B would be better <br />understood with the following changes: <br />For 2010 Lift A, please replace the 31,593 CY with 29,382 CY, which changes the <br />total to 175,719 CY, and delete "(100% recovery) ". <br />