Laserfiche WebLink
in seepage flows, will be reported to the design engineer immediately. During each <br /> inspection, the reservoir gage rod reading and seepage rate at the outlet headwall drains <br /> will be recorded. Sample monitoring forms for the initial reservoir filling and for the normal <br /> monthly monitoring are included in Appendix F. <br />• <br /> 8 <br /> s <br />