My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-30_INSPECTION - M1984013
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1984013
>
2010-08-30_INSPECTION - M1984013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:20:27 PM
Creation date
8/31/2010 11:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984013
IBM Index Class Name
INSPECTION
Doc Date
8/30/2010
Doc Name
Insp Rpt
From
DRMS
To
George E. Otten
Inspection Date
7/27/2010
Email Name
DB2
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />/3. Problem: The financial warranty is not at a level that reflects the actual cost to reclaim the site. /rBD/ <br />PB or PV: PB <br />TOPIC(S): --E.W- <br />Corrective Action: To bring the operation into compliance with §34-32.5-117(4)(b)(1) C.R.S.. and Rule <br />4.2.1. the operator must provide additional financial warranty sufficient to bring the total financial <br />warranty up to $8,162. Official notification of the increase will be sent under separate cover, and the <br />operator will have 60 days from the date of that letter to provide the additional amount. <br />CORRECTION DATE <br />14A . Problem: Based on annual reports submitted to the Division, there has been no activity at the 11 /01 /2010 <br />site for several years. <br />PB or PV: PB <br />TOPIC(S): AR <br />Corrective Action: To bring the operation into compliance with 634-32-103(6)(a)(II) C.R.S. and Rule <br />1.13, within 60 days of the date of this report, submit evidence that mining has occurred at the site in <br />the past 180 days or submit a notice of Temporary Cessation accompanied by the $115 fee. <br />V5. Problem: Refuse has not been managed in accordance with §34-32-116(7)(d) C.R.S., i.e., in a <br />manner that controls unsightliness or prevents deleterious effects from the refuse. <br />Corrective Action: To bring th e operation into compliance with 634-32-116(7)(d) C.R.S., within 90 <br />d <br />f <br />h <br />d <br />f <br />hi <br />i i <br />b <br />i <br />h h <br />id <br />h <br />h <br />f <br />bl <br />ays <br />rom t <br />e <br />ate o <br />t <br />s <br />n <br />the site has been abated. Eq spe <br />uip ct <br />on report. su <br />m <br />t p <br />otogr <br />ment that is damaged to the ap <br />ic ev <br />ence t <br />at t <br />e re <br />use pro <br />em at <br />point that it is no longer usable should be <br />removed. Anye!Quipment th at is not planned for use i n the foreseeable future should also be <br />removed- <br />11/29/2010 <br />PB or PV: PB <br />TOPIC(S): MP <br />RS
The URL can be used to link to this page
Your browser does not support the video tag.