Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name : DRMS <br />Task #: 01a Stale : Colorado Permit/job# : M-1977-284 <br />Date : 23-Aug-2010 County :Montrose Abbreviation :none _ <br />User:- GRM Site : Mineral Joe Claims Filename : M284-01 a <br />Permitting action :Reclamation Liability Estimate - 2010 update <br />Task description : demolish and remove surface structures at Duggan <br />UNIT COSTS Last unit cost update : March 2009 Location adjustment : 96.83% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-compressor shed 20X10X8 Push rubble into pit - to 50 ft. 60.00 CY $0.3700 _ $22.20 <br />_ <br />-compressor shed slab <br />20X10X4" <br />Demo./disp. exs. pit, 4" th.- 50 ft. <br />200.00 <br />SF <br />$1.1176 _ <br />_ $223.51 <br />-substation security fencing 15X10 enclosure Fencing, chain link - 8-10 ft. H 150.00 LF $2.4570 $368.55 <br />-powerline 500 LF Power/phone line - single pole 500.00 LF $2.7737 $1,386.84 <br />-rail from adit to load out 150 LF Railroad track - Ties and track 150.00 LF $8.2337 $1,235.05 <br /> <br />-load out structure 100"L X 50'H wood/metal 3,000.00 CF $0.9200 $2,760.00 <br />-misc. debris 20 X 20X 10 Load/haul/dump rubble-to 1, 000 ft. 150.00 CY $0.7450 $111.75 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $6,108 Total Cost (adjusted for location): $5,914