Laserfiche WebLink
7.) Please provide plans for topsoil segregation, preservation, and replacement. <br />8.) Please submit a plan or schedule indicating how and when reclamation will be implemented. Such plan or <br />schedule shall not be tied to any specific date but shall be tied to implementation or completion of different stages <br />of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br />a.) An estimate of the periods of time which will be required for the various stages or phases of <br />reclamation; <br />b.) A description of the size and location of each area to be reclaimed during each phase; and <br />c.) An outline of the sequence in which each stage or phase of reclamation will be carried out. <br />EXHIBIT F - Reclamation Plan Map (Rule 6.4.6): <br />9.) The submitted map does not meet the requirements of Rule 6.4.6, please submit a map depicting the following: <br />a.) The expected physical appearance of the area of the affected land, correlated to the <br />proposed mining and reclamation timetables. The map must show proposed topography of <br />the area with contour lines of sufficient detail to portray the direction and rate of slope of all <br />reclaimed lands; and <br />b.) Portrayal of the proposed final land use for each portion of the affected lands. <br />EXHIBIT G - Water Information (Rule 6.4.7): <br />This exhibit was not included in the submission. <br />10.) If the operation is not expected to directly affect surface or groundwater systems, a statement of that <br />expectation shall be submitted. <br />11.) if the operation is expected to directly affect surface or groundwater systems, you shall: <br />a.) Locate on the map (in Exhibit C) tributary water courses, wells, springs, stock water ponds, <br />reservoirs, and ditches on the affected land and on adjacent lands where such structures <br />may be affected by the proposed mining operations; <br />b.) Identify all known aquifers; and <br />c.) Submit a brief statement or plan showing how water from dewatering operations or from <br />runoff from disturbed areas, piled material and operating surfaces will be managed to <br />protect against pollution of either surface or groundwater (and, where applicable, control <br />pollution in a manner that is consistent with water quality discharge permits), both during <br />and after the operation. <br />11.) You must provide an estimate of the project water requirements including flow rates and annual volumes for <br />the development, mining and reclamation phases of the project. <br />12.) You must indicate the projected amount from each of the sources of water to supply the project water <br />requirements for the mining operation and reclamation