My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/26/2010 7:30:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/25/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Week of 08/01/2010 & 08/08/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame& <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: August 7, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 8/1/10 through 8/7/10 <br />Days S M T W T F S <br />Work Shifts - D D D D D D <br /> - N - N - - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 47°F to 53°F (+/-) High: 70°F to 82°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Afternoon rain showers delayed work activities during the week. Due to heavy rainfall, <br />erosion of the Phase 5 VLF east slope was observed. Sediment reported to the bottom of the Phase <br />5 PSSA. Ames began remediation and installation of temporary erosion controls. <br />AMEC was informed by Ames that nightshift would resume Monday, 8/9/2010. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />No work performed during the week (see Figure 1 for previous subgrade acceptance). <br />B) Slope Contouring <br />1) VLF <br />No work performed during the week. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />D) Soil Liner Fill <br />1) VLF <br />No work performed during the week (see Figure 2 for previous soil liner fill placement). <br />VLF Weekly Report WE 08.07.10.D.docx
The URL can be used to link to this page
Your browser does not support the video tag.