Laserfiche WebLink
AVIA <br />ameCl-y <br />D) Anchor Trench <br />1) VLF <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC continuously monitored DCF placement within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the installation of the high volume solution collection system. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture-Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue processing DCF material at the Drain Cover Fill process area. <br />Continue subgrade preparation for SLF placement. <br />Continue SLF placement within the Phase 5 VLF footprint. <br />Continue geomembrane installation within the Phase 5 VLF footprint. <br />Continue high and low volume collection systems. <br />Continue LVSCF placement. <br />Continue DCF placement. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />CC&V held a Weekly Construction meeting on August 10, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />VLF Weekly Report WE 08.14.10.13