2010-08-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/26/2010 7:30:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/25/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Week of 08/01/2010 & 08/08/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame& <br />2) Drain Cover Fill (DCF) Processing <br />Processing of DCF material continued this week using a CAT D-9 dozer. <br /> <br />Location This Week Cumulative <br />Comments <br /> (tons) (tons) <br />DCF Process 35,654 109,279 <br />Total 35,654 109,279 <br />111) Storm Water Management <br />A) Temporary Erosion Controls <br />Ames continued remediation and installation of silt fence at the east slope of the Phase 5 VLF. <br />This was performed to prevent and control erosion of the slope. Storm water was also pumped <br />from the construction areas into the phase IV leach pad. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued at the beginning of the week, <br />performing deployment, seaming, and repair/QC activities. Geomembrane installation was <br />performed in the area shown on Figure 3. Approximately 52,964 square feet of 100mi1 LLDPE <br />geomembrane was deployed using a John Deere 200 excavator and a John Deere 544 front-end <br />loader with spreader-bar attachments. Subgrade was inspected and approved by AMEC and <br />Lonestar representatives prior to geomembrane deployment (see Figure 3). Approximately <br />2,684 linear feet of seam was fusion welded during deployment using up to three fusion <br />welding machines. Six destructive test samples were marked during fusion seaming. All <br />destructive sample test results met project specifications. Non-destructive testing was <br />performed for all fusion welded seams. Repairs were performed using the extrusion welding <br />method for all marked defects. Vacuum testing was performed for all extrusion welded seams <br />and repairs. All testing performed met the required project specifications. <br />B) Geomembrane Acceptance <br />1) VLF <br />Primary 100mi1(P-180 thru P-289) geomembrane shown on Figure 4 was inspected by AMEC <br />and Lonestar representatives and found to be installed within project specifications and <br />acceptable for continued construction activities. <br />C) Geomembrane Delivery <br />1) VLF <br />No geomembrane was delivered to site during the week. <br />VLF Weekly Report WE 08.14.10.13