Laserfiche WebLink
August 16, 2010 C-1982-056/Foidel Creek Mine JDM <br />approved disturbance. <br />TOPSOIL - Rule 4.060 ?Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />The topsoil pile at the 18LT Borehole displayed heavy weedy vegetation. The weed infestation of the pile should <br />be managed to ensure the protection of the topsoil. ' <br />SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS - Rule 4.07 <br />RECLAMATION PLAN COMPLIANCE - Rule 4.13 <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 5 of 8