My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C, Triangle Liner Cert.- Apend. D- Tech Specs
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameclo <br />¦ report any deficiencies to MANAGER that are not corrected to the satisfaction of the CQA <br />Monitor, including design or SPECIFICATION changes; and <br />¦ prepare a Construction Certification Report describing the construction, any deviations from <br />SPECIFICATIONS or DRAWINGS and details, details of all field and laboratory test data, <br />tests results (both laboratory and field), professional certification that construction was <br />completed in accordance with the DRAWINGS and SPECIFICATIONS. The Construction <br />' Certification Report will be signed and sealed by the CERTIFYING ENGINEER registered <br />in the State of Colorado; <br />¦ monitor the ambient air temperature and fill temperature, as outlined in specification Section <br />2200; and, <br />¦ maintain an on-site soils laboratory and perform regular calibration of equipment. <br />2.06 EARTHWORKS CONTRACTOR <br />The Earthworks Contractor, also referred to as "CONTRACTOR", is responsible for proper processing, <br />delivery and placement of all components as outlined in the SPECIFICATIONS. <br />PART 3: LINES OF COMMUNICATION <br />The CQA Monitor shall be capable of direct communication with MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER at all times. Deficiencies that can be easily remedied, such as unsatisfactory test <br />results, will be dealt with directly between the CQA Monitor, and CONTRACTOR. The CQA Monitor will <br />also discuss any deficiencies with the CERTIFYING ENGINEER. <br />If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER, and/or <br />MANAGER that can not be resolved among themselves, MANAGER shall present the matter to CC&V with <br />MANAGER related recommendations and CC&V shall decide the matter with such decision being final. <br />PART 4: DEFICIENCIES <br />When deficiencies (items that do not meet SPECIFICATIONS or DRAWINGS) are discovered, the CQA <br />Monitor will immediately determine the nature and extent of the problem and notify the CONTRACTOR. If <br />unsatisfactory test results identify a deficiency, additional tests will be performed to define the extent of the <br />deficient area. <br />' CONTRACTOR shall correct the deficiency to the satisfaction of the CQA Monitor. If CONTRACTOR is <br />unable to correct the problem, the CQA Monitor will notify MANAGER and CERTIFYING ENGINEER <br />which will assist in problem resolution. If the solution involves a design revision, the DESIGN ENGINEER <br />shall also be contacted. <br />The CQA Monitor shall retest and the MANAGER and CERTIFYING ENGINEER shall approve the <br />corrected deficiencies before any additional related work is performed by CONTRACTOR. All retests and <br />related documentation shall be recorded by the CQA Monitor and included in the Construction Certification <br />r Report. <br />PARTS: MEETINGS <br />This section identifies and describes the meetings to be held during the course of the construction. Meetings <br />shall be held in order to clearly define construction activities and goals in order to facilitate construction. <br />Section 01400.1 <br />Earthworks CQA Plan <br />SAProjects\1125E CCV CQA\I -Tech Specs\01400.1.rl.doc <br />Page 3 of 9 September 3, 2008 <br />Revision 1
The URL can be used to link to this page
Your browser does not support the video tag.