amec'e <br />5.01 PRECONSTRUCTION MEETING: <br />MANAGER will hold a preconstruction meeting at the site prior to the start of construction. MANAGER, <br />DESIGN ENGINEER, CERTIFYING ENGINEER, CQA Monitor, CONTRACTOR, and others <br />designated by MANAGER shall attend this meeting. The purpose of this meeting will be to: <br />¦ review the construction DRAWINGS, CQA Plan, and SPECIFICATIONS; <br />¦ define the responsibilities of each party; <br />¦ define lines of communication and authority; <br />¦ review method of documentation, testing procedures, and reporting inspection data; <br />¦ establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and <br />¦ discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />¦ This meeting will be documented by MANAGER and copies will be distributed to all parties. <br />5.02 PROGRESS MEETINGS: <br />' MANAGER will hold a daily progress meeting, either before the start of work or at the completion of work. <br />At a minimum, this meeting will be attended by the CQA Monitor and CONTRACTOR. The purpose of this <br />meeting will be to: <br />' review all the previous day's accomplishments and activities; <br />¦ review scheduled work location and activities for the day; <br />1 ¦ discuss any problems or potential construction problems; and, <br />¦ review test data. <br />' 5.03 DEFICIENCY MEETINGS: <br />' Special meetings will be held, as needed, to discuss potential problems or deficiencies. At a minimum, these <br />meetings will be attended by the CQA Monitor and CONTRACTOR. If the problem relates to a design issue, <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER should also be present. The meeting <br />will be documented by the CQA Monitor. <br />PART 6: EARTHWORKS CONSTRUCTION OUALITY ASSURANCE <br />Construction of the valley leach facility or specified earthworks shall be in accordance with the DRAWINGS <br />and SPECIFICATIONS. A CQA monitoring and testing program shall be implemented by CC&V to ensure <br />construction compliance by the CONTRACTOR. The CQA testing program shall consist of construction <br />testing of materials used in the valley leach facility construction. The types of materials are defined in the <br />SPECIFICATIONS. During construction, the CQA Monitor shall sample and test these soil types to determine <br />if they meet SPECIFICATIONS. The CQA Monitor shall obtain and test soil samples in accordance with <br />American Society for Testing and Material standards ASTM D75 and ASTM D420. All tests shall be <br />Section 01400.1 Page 4 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />SAProiects\1125E CCV CQA\I -Tech Specs\01400.1.rt.doc