Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 413/C Triangle Liner Certification <br />August 10, 2010 <br />7.0 CONCLUSIONS <br />In accordance with our responsibilities as the Certifying Engineer and as the Quality Assurance <br />Consultant for the certification of the Phase 4B/4C Triangle, and per the requirements of the <br />various applicable DRMS approvals, AMEC Earth and Environmental (AMEC) attests that it <br />1 observed and performed the required CQA activities for this project. Based on daily <br />communications with AMEC personnel, observations made during on-site visits, and review of <br />the laboratory and field test results, AMEC attests that the Phase 4B/4C Triangle was <br />constructed in compliance with specifications as described in this document. <br /> <br /> <br />L77, <br /> <br /> <br />I SAPROJECTS\1125E CCV CQA\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC 21