My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C Triangle Liner Cert.- Cover to Append. C, Weekly Rpts.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B/C Triangle Liner Certification <br />August 10, 2010 <br />If a pressure test failed, Lonestar checked the seam section for leakage, and repaired and <br />re-tested the seam. If Lonestar was unable to find the leak, the seam was divided into two <br />sections, with each section being tested to locate the area of concern. This subdivision process <br />was repeated until the leak location was identified. If the leak area was not located, Lonestar <br />reconstructed the seam, and then vacuum tested the repair. <br />Lonestar tested extrusion welded seam sections with a vacuum box. Prior to vacuum box <br />testing, Lonestar applied a soap and water solution to the seam section. The vacuum box was <br />then placed over the seam area and energized with a vacuum pump capable of creating a <br />vacuum of not less than 5 psi. Lonestar and AMEC observed the action of the vacuum on the <br />seam for a minimum of ten seconds. Each consecutively tested seam length was overlapped a <br />minimum of 3 inches. If soap bubbles appeared, AMEC marked and documented the leak <br />location. Lonestar then repaired the leak and vacuum tested the repair. This procedure was <br />also followed to test extrusion repairs and extrusion patches. <br />The seam non-destructive test summaries (fusion pressure tests and extrusion vacuum tests) <br />for the geomembrane are presented in Appendix H-5. <br />S:\PROJECTS\1125E CCV CQA\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC 20
The URL can be used to link to this page
Your browser does not support the video tag.