My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-17_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-17_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/19/2010 8:12:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/17/2010
Doc Name
QA Monitoring & Test Results- Phase IV B/C Triangle Liner Cert.- Cover to Append. C, Weekly Rpts.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B/C Triangle Liner Certification <br />August 10, 2010 <br />During geomembrane deployment, AMEC measured sheet thickness with a digital caliper. <br />AMEC measured sheet thickness at five random locations along one edge of each <br />geomembrane panel. The average thickness specified for the 100-mil geomembrane was 101 <br />mils. Project specifications for 100-mil geomembrane required that the average of the five <br />thickness measurements be no less than the 100 mils, and that no individual measurement be <br />less than 90 mils. The thickness monitoring provided by AMEC indicated that all of the panels <br />' met or exceeded project requirements. <br />AMEC personnel measured deployed panel lengths by use of a measuring wheel. Recorded <br />lengths were approximate, and do not reflect any trimming or adjustments made for final <br />placement or anchor trench lengths. <br />AMEC personnel observed the surface of each deployed panel. AMEC logged any penetration <br />defects and marked them on the panel. Section 6.1.4 provides further discussion of repairs. <br />AMEC also observed the overlap of each panel with adjacent panels to verify that sufficient <br />overlap for seaming existed. AMEC logged insufficient panel overlaps as defects and marked <br />them for correction. <br />Ames surveyed all panel intersections and destructive seam sample locations. <br />6.1.3 Seaming <br />The double wedge fusion weld was the principal seaming method employed by Lonestar for this <br />project. Lonestar fusion seamed (welded) geomembrane on the same day that it was deployed. <br />Lonestar used extrusion welds for seaming where the geomembrane tied into the existing VLF <br />geomembrane. AMEC observed trial seam tests, monitored seaming equipment temperatures <br />and speed, and provided visual observation of the seaming procedures. AMEC observed the <br />entire lengths of all seams, patches, and other repairs either during seaming, or shortly after <br />completion. <br />6.1.3.1 Trial Seam Monitoring <br />Lonestar performed trial seams to monitor the performance of the seaming apparatus and <br />operator under actual site conditions. Each welding operator and his apparatus produced trial <br />seams prior to the beginning of each day's seaming operation and in the event that devices <br />were disconnected from power and re-energized. <br />Lonestar cut 1-inch wide samples (coupons) from each trial seam and tested the coupons with a <br />field tensiometer. Lonestar tested each double wedge fusion trial seam twice for peel adhesion <br />(peel) and once for bonded seam strength (shear). Lonestar conducted peel tests on fusion <br />welds on both the inner and outer tracks of each peel coupon. Lonestar tested each extrusion <br />trial seam twice for peel and once for shear. <br />S:\PROJECTS\1125E CCV CQA\H2 - DESIGN\TRIANGLE\FINAL\TRIANGLE CERTIFICATION REPORT FINAL REVI.DOC 17
The URL can be used to link to this page
Your browser does not support the video tag.