My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REVISION - C1981008 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-08-10_REVISION - C1981008 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:43 PM
Creation date
8/18/2010 5:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
8/10/2010
Doc Name
Response 4 Revised Section 2.05.4(2)(d)
From
Western Fuels-Colorado
To
DRMS
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil Volumes Available <br />Topsoil volumes are calculated from pre -mine sample points. The calculations are shown on Map <br />2.05.4 -6 (Table A). If there is excess topsoil salvaged, it will be placed in the appropriate zone based <br />on the topsoil needs of the reclamation plan at that time. This potential excess is not included in any <br />of the topsoil balance calculations in order to be conservative in planning topsoil placement. The <br />remaining area to be stripped in front of the active disturbance is as follows: <br />Lift A Topsoil <br />Lift A: 29.3 acres - 3.19 acres already stripped for Pond 013, = 26.11 acres. <br />Lift A volume available from additional stripping = 26.11 acres x 9 inches avg. thickness = 31,593 <br />cy. The total Lift A available is 31,593 cy (from new stripping) + 146,337 cy from Stockpile #11 = <br />177,930 cy. Lift A Topsoil in front of the June 2010 active pit will be combined with stockpiled Lift A <br />Topsoil and spread over the 54.33 acres of Zone 4 to attain a thickness of 24 inches. <br />Stockpile #14 will also be created from final cut stripping, which will be approximately 35,450 cy, <br />which will be used to reclaim Zone #4. <br />A small stockpile of Lift A material will remain after final backfilling and filling to reclaim Pond 011, as <br />shown on Map 2.05.4 -6. This is Stockpile #18, which will contain approximately 7,250 cy. <br />Lift B Topsoil <br />Lift B: 29.3 acres - 3.19 acres (pond 013) + 1.72 acres additional area on east edge of stripping <br />area = 27.83 acres. <br />The remaining Lift B Topsoil to be stripped in front of the June 2010 active pit = 27.83 acres x 46 <br />inch average thickness = 172,113 cy. <br />The total Lift B available is 172,113 cy (from new stripping) + 221,516 cy from Stockpile #12 = <br />393,629 cy. Lift B Topsoil in front of the June 2010 active pit will be combined with stockpiled Lift B <br />Revised PR 06 June 10 2.05.4(2)(d) -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.