Laserfiche WebLink
<br />A small cut is required for safe placement of the rock dust bin and supporting equipment. A <br />small ditch will route the stormwater around the cut to insure integrity of the cut slope. A <br />portion of the cut material will be placed to level the hoisting and conveyor drive areas. The <br />remainder of the cut material is proposed to be used for the construction of the acceleration <br />deceleration lanes at the mine access per the Colorado Department of Transportation <br />construction permit. Topsoil will be removed and stored in the topsoil storage pile located near <br />the mine entrance. <br />The bond increase has been estimated at $329,055. The detail is included in Exhibit 28 pages <br />129-133. <br />Sincerely, <br />Ron Thompson <br />Mine Superintendent <br />Enclosures: Permit Revision Application Form <br />Exhibit 28 - Bond Estimate pages 129-133 <br />Permit Pages <br />Map 11 - East Portal Site Facilities <br />Public Notice