Laserfiche WebLink
<br />NEW ELK COAL <br />COMPANY <br />?uG ? 6?u?u A, <br />August 13, 2010 <br />Mr. Kent Gorham <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: New Elk Mine Permit C-81-012 <br />Site Plan Revision <br />Technical Revision (TR-54) <br />Dear Mr. Gorham: <br />Attached please find a proposed technical revision to update the site facilities in the <br />New Elk Mine permit. The technical revision provides for the construction of <br />surface facilities and placement of equipment at the East Portal area within the <br />surface disturbance boundary on surface lands owned by New Elk Coal Company, <br />LLC. Specifically, pages 2.05.5, 6 and 7 have been revised. Additional pages for <br />Exhibit 28-Bond Calculations are included. Also included are the public notice and <br />application. <br />Facilities proposed include: slope conveyor drive, hoist house, hoist sheave, rock box <br />addition to the breaker building, central pumping station building, sewage plant building, <br />water pipe vaults, 1-400,000 gallon water tank, 1-25,000 gallon potable water tank, slope <br />rail turnout, rock dust bin, rock dust compressor, rock dust pressure vessel, water <br />distribution pipeline, emergency escape hoist and electrical power distribution upgrade. <br />The locations of the proposed facilities are noted on Map 11 Surface Facilities and Roads <br />East Portal. The map is in transition from mylar to digital. A scanned image of the mylar <br />map is included as reference behind the digital information <br />122 W. First Street I PHONE I (719) 845-0090 <br />Trinidad, CO 81082 FAX ((719) 845-0077 <br />E-MAIL ronthompson@newelkcoal.com