My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REVISION - M1983159
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983159
>
2010-08-10_REVISION - M1983159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:20 AM
Creation date
8/16/2010 10:48:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983159
IBM Index Class Name
REVISION
Doc Date
8/10/2010
Doc Name
Increase Notice SI-01 Gleason Pit
From
DRMS
To
S&S Aggregrates, Inc
Type & Sequence
SI1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Liability estimate -2010 update <br />Task description :highwall reduction from 0.5:1 to 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D8R Series lI - 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $1.59 25 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $164.49 Total fleet cost/hour : $164.49 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3,769 LCY factor : NA volume : 3,769 LCY <br />Source of estimated volume :accepted volumes from last update <br />Source of estimated swell factor : NA <br /> <br />........ ..... .: <br />HOURLY PRODUCTION Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 10.00 % (I <br />Average site altitude : 6,560 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br /> <br />Job efficiency : <br />0.83 _ <br />(1shift1day) <br />Spoil pile: 0.80 (fnd-ro <br />Push gradient : 1.22 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.48 <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 667.14 LCY/hr <br />Adjusted fleet production : 667.14 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 5.65 Hours <br />Unit cost : $0.247 /LCY Total job cost : $929
The URL can be used to link to this page
Your browser does not support the video tag.