Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -highwall reduction from 0.5:1 to 3:1 dozer 1 5.6 $929 <br />02a -highwa/l reduction 2:1 to 3:1 dozer 1 0.7 $131 <br />03a -rip and rough grade 8 acres of disturbance ripper 1 27.4 _ $4,624 <br />04a -spread 3" to 6" of topsoil over 10 acres scraper2 1 10.5 $2,364 <br />05a -reveg of 10 acres maximum disturbance revege 1 16.0 $13,897 <br />06a -initial mobilization to site mobilize 5 3.4 $1,661 <br />07a -secondary seeding and reclamation mobilization mobilize 1 3.4 $438 <br />08a -removal of trash and debris NA 1 8.0 $2,500 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 75.3 $26,544 <br />includes inflation factor adjustment of : NA % TOTAL DIRECT COST' _ $26,544 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $536 <br />Performance bond : 1.05 % of direct total $279 <br />Job superintendent : NA` NA NA total= <br />_ _ NA <br />Profit : 10.00 % of direct total = $2,654 <br />. not required (or eqp. operator serves as super.) TOTAL O & P = _ $3,469 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $30,013 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total =_ $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,501 <br />CONTINGENCY - NA` NA total = NA <br />" contingencies accounted for at task level TOTAL INDIRECT COST = _$4,970 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $31,514 <br />